Case study · 10
Finding a Hidden Factory Inside an Existing Plant
How a loss mapping baseline and daily management routine lifted OEE 22 percent in nine months at roughly one tenth the cost of a proposed capacity investment.
- Sector
- Industrial components manufacturing
- Engagement
- Operations performance transformation
01 The Problem
The operating constraint behind the numbers
A mid sized industrial components manufacturer, squeezed by import competition, believed it needed a major capacity investment. Its critical lines told a different story once measured, with capacity being lost daily to changeovers, minor stoppages and quality escapes that nobody tracked consistently.
02 The Evidence
The evidence leadership could act on
Changeover (Die Change) Time: Before vs After Redesign
Source: Changeover redesign cut die change time by more than half
Overall Equipment Effectiveness Improvement Over Nine Months
Start
Baseline OEE
9 months
Source: Overall equipment effectiveness improved 22 percent in nine months
03 The Kingswell Response
What changed in the management system
Build a loss mapping baseline
A loss mapping baseline was built on the four constraint lines.
Redesign changeovers
Changeover redesign cut die change time by more than half.
Install live stoppage visibility
Low cost sensors and a stoppage tracking screen gave line leaders live visibility.
Run daily loss reviews and add in-line quality measurement
Daily loss reviews assigned every recurring loss an owner, and in line quality measurement was added at the two steps generating most escapes.
04 What Remained
The management system installed
05 The Result
What the organisation could do next
A loss mapping baseline was built on the four constraint lines. Changeover redesign cut die change time by more than half, low cost sensors and a stoppage tracking screen gave line leaders live visibility, daily loss reviews assigned every recurring loss an owner, and in line quality measurement was added at the two steps generating most escapes. Overall equipment effectiveness improved 22 percent in nine months, equivalent to the output of the proposed capital investment at roughly one tenth of its cost. The plant manager credits the daily management routine more than any device installed.
06 Related Capabilities
07 Related Industries
08 Related Insights
09 Related Case Studies
Have A Similar Situation
Facingacomparabledecision?
Every engagement starts with the specifics of your situation, not a generic proposal. Tell us what's in front of you.
Prefer to write directly? contact@kingswellstrategy.com
What happens next
Reference this case, or describe what you're facing.
Senior specialists matched to your problem, not a generic team.
Whether and how we can help, within days.