Finding a Hidden Factory Inside an Existing Plant

How a loss mapping baseline and daily management routine lifted OEE 22 percent in nine months at roughly one tenth the cost of a proposed capacity investment.

Sector
Industrial components manufacturing
Engagement
Operations performance transformation
22% in nine monthsOEE improvement
Cut by more than halfChangeover (die change) time
Roughly one tenth of the costVs. proposed capital investment

The operating constraint behind the numbers

A mid sized industrial components manufacturer, squeezed by import competition, believed it needed a major capacity investment. Its critical lines told a different story once measured, with capacity being lost daily to changeovers, minor stoppages and quality escapes that nobody tracked consistently.

The evidence leadership could act on

Changeover (Die Change) Time: Before vs After Redesign

Before changeover redesignBaseline die change time
After changeover redesignCut by more than half

Source: Changeover redesign cut die change time by more than half

Overall Equipment Effectiveness Improvement Over Nine Months

Start

Baseline OEE

+22% OEE improvement

9 months

Source: Overall equipment effectiveness improved 22 percent in nine months

What changed in the management system

01

Build a loss mapping baseline

A loss mapping baseline was built on the four constraint lines.

02

Redesign changeovers

Changeover redesign cut die change time by more than half.

03

Install live stoppage visibility

Low cost sensors and a stoppage tracking screen gave line leaders live visibility.

04

Run daily loss reviews and add in-line quality measurement

Daily loss reviews assigned every recurring loss an owner, and in line quality measurement was added at the two steps generating most escapes.

04  What Remained

The management system installed

Loss mapping baseline
Low cost sensors
Stoppage tracking screen
Daily loss review rhythm
In line quality measurement

What the organisation could do next

A loss mapping baseline was built on the four constraint lines. Changeover redesign cut die change time by more than half, low cost sensors and a stoppage tracking screen gave line leaders live visibility, daily loss reviews assigned every recurring loss an owner, and in line quality measurement was added at the two steps generating most escapes. Overall equipment effectiveness improved 22 percent in nine months, equivalent to the output of the proposed capital investment at roughly one tenth of its cost. The plant manager credits the daily management routine more than any device installed.

Have A Similar Situation

Facingacomparabledecision?

Every engagement starts with the specifics of your situation, not a generic proposal. Tell us what's in front of you.

Prefer to write directly? contact@kingswellstrategy.com

What happens next

01
Tell us the situation

Reference this case, or describe what you're facing.

02
We assemble the right people

Senior specialists matched to your problem, not a generic team.

03
A straight answer

Whether and how we can help, within days.